The FV Syzygy Sea is currently configured as an aquaculture support vessel however would make conversion back to prawn trawl or danish seine fisheries. The vessel is in AMSA 3B Survey for crew of 6 with next shaft survey due in 2026. The main engine and gear box were installed new in 2020 with only 1,670 Hours since installation.
The vessel has a large freezer hold capacity (18 Tonne) and is fitted with handling systems for aquaculture feeding and extented towing operations. Vessel Stability Book and Condition Survey Report (dated September 2022) available for serious enquiries.
Please contact Christian Pyke on 0428 233 200 with enquiries.
Vessel Information
Material | Steel Hull & Superstructure |
---|---|
Year Built | 1988 |
Location Built | |
Rebuild (if applicable) | Conversion from Prawn Trawler at Adelaide Ship Construction in 2010 |
Class / Survey | AMSA 3B - 6 Crew (Next Shaft Survey in AUG 2026) |
Gross Tonnage | 73.1 Tonnes |
Displacement Tonnes | |
Dimensions | 19.70m Length x 5.84m Beam x 3m Draft |
TOP ^ |
Engine
Main Engine | Cummins NTA 855T (installed new in 2020 - low hours and excellent condition) |
---|---|
Horse Power | 300 HP @ 1800 RPM |
Engine Hours | 1,670 Hrs from new |
Rebuild | |
Fuel Capacity | 5 x Tanks with 2 aft tanks for daily service |
Freshwater Capacity | 2 x Tanks (fwd) with high capacity desalinator |
Gearbox | Twin Disc MG516 (installed new with main engine in 2020) |
Reduction Gear | 6:1 |
Speed | |
Bollard Pull | |
Aux Engine/Generator | 1 x John Deere 3D-241 (150 HP) with 110 KVA Stamford Generator (Auxiliary fitted new in 2014 with approx. 8,000 Hrs since installation) / 1 x Cummins 6BT (160 HP) with 100 KVA Mecc Alte Generator (Engine fitted new in 2008 with approx. 10,000 Hrs since new). |
Thrusters | |
Propulsion | Single Screw |
Steering Gear | Power Hydraulic |
Steering stations (number of) | 1 |
TOP ^ |
Electronics
Radar | Furuno NavNet |
---|---|
Sonar | |
Sounders | Furuno FCV 1100L |
Radios | VHF / HF / Private Radios / Thrane & Thrane Satellite Phone |
Plotters | C-Plot |
GPS | Furuno GP39 / Saura T150 Magnetic Compass |
Autopilot | Furuno NavPilot |
VMS | |
TOP ^ |
Equipment
Unloading Crane/Boom (if applicable) | Fassi Deck Crane |
---|---|
Deck Equipment | Hydraulic System is 1 x 3 phase powerpack operating deck equipment and winches |
Factory / Processing Plant (if applicable) | |
RSW Plant | |
Freezer Plant | 18 Tonne Freezer Hold (-18 degrees) powered by 2 x Bitzer compressors |
Fish Hold | 18 Tonne Freezer Hold |
Cooling System | 2 x Bitzer Compressors / Muller FDC |
Accomodation | 2 x Single Berth Cabins & 1 x 4 Berth Cabins / Large Galley and Mess Area / Shower and Laundry |
Various | The working aft deck area (from the rear of the deck-crane) is approx 6m in length to the stern of the vessel. The galley and accommodation contain: |
TOP ^ |